Skip to content

X30 Site Acceptance Test

The tests that hand an X30 patrol over to a substation: procedures, pass criteria, record sheets and sign-off

Version 1.0 · 2026-11-21

For the commissioning engineer and the substation’s representatives who witness and sign the acceptance. Print it, fill it in on site, keep the signed copy.

Run it after the installation (X30 Installation Guide) and the tuning (X30 Tuning Guide), on the site’s own routes, with the robot and the software versions that will be handed over.

Download: the printable PDF.

Chapters ​